Tooling & Metrology Suite

A tool to track jigs, measuring instruments and production tools, and never miss a calibration deadline again. What matters comes first: the next shipment to prepare, what is overdue, and what is currently at a laboratory.

Interactive demo: Cévia Mobil preloaded (22 jigs, instruments and tools, 4 partner laboratories). Open a record, arrange a shipment and watch the deadlines recalculate. Open full screen →

The problem

In this company, dozens of jigs, measuring instruments and production tools were spread over several lines, with no common register: everyone roughly knew where their tool was, nobody had an overview. Metrology shipments were decided case by case, through back-and-forth e-mails and phone calls with laboratories, and calibration dates, noted here and there, ended up forgotten. An audit eventually found several instruments past their verification date — the kind of non-conformity that directly threatens ISO 9001 certification. The tool now centralises every jig and instrument with its deadline, so no date gets lost between two departments.

The tool

A single register for jigs, measuring instruments and production tools, with their inspection interval, assigned line and usual laboratory. Each inspection goes through the same steps, tracked one by one: to schedule, shipment arranged, at the laboratory, result entered — and the next inspection schedules itself, at the right date.

How it works

  • Single register: jigs, measuring instruments and production tools, with type, family, assigned line or station, owner and inspection interval.
  • Prioritised dashboard: next tool to send, overdue items, deadlines within 30 days and tools currently at a laboratory — never calculated differently from one page to another.
  • Step-by-step metrology tracking: arrange the shipment, confirm departure, enter the result on return (compliant or not, measured deviation, certificate reference) — the next inspection is scheduled automatically.
  • Partner laboratories: specialities, average turnaround, accreditation and number of tools each one currently handles, internal Methods inspection included.
  • Documents found: life records, certificates, drawings, reports and shipping notes indexed from the shared folder, linked to each tool.
  • Retirement tracked: a retired tool is archived, never deleted — it stays viewable for traceability.

What it changes

  • Fewer non-conformities: a jig or instrument past its calibration date is visible before use, not discovered afterwards.
  • Shipments planned ahead: the next tool to send is always known, no need to check a separate spreadsheet.
  • Full traceability: inspection history, certificates and documents linked to each tool, with no searching through scattered folders.
  • Certification secured: verification deadlines no longer depend on anyone's memory — enough to pass an ISO 9001 audit with no bad surprise on measuring instruments.
  • A register always up to date: continuously, instead of a spreadsheet that ages between two audits.

A tool that connects to the others

Each tool is already linked to a line or station, with an owner: this register can serve directly as a base for other tools.

  • With theline balancing : each task can be linked to the jigs and instruments it uses. A tool away for calibration or retired immediately flags the tasks and stations concerned, so a replacement can be planned.
  • With skills management : use of certain instruments can be restricted to trained, certified people, and tool owners tracked like any other skill.
  • With quality management : a non-compliant result back from the laboratory can directly open a non-conformity, linked to the tool and its certificate.

Our demos are shown separately, but nothing prevents linking them. With a shared database, the tools can form a real intranet built around your business: each department uses its own screens, and information entered once is available everywhere.

Are your metrology deadlines under control?

Describe your jigs, measuring instruments and usual laboratories. We will define with you the deadlines to track first, so you can face your next ISO 9001 audit with peace of mind.

Get a first opinion