Quality: incidents handled all the way to prevention

Demo on NOVALIA, a fictional company with 250 employees · sample data · adaptable to the way you work

Detect, qualify, analyse, act, verify, capture, prevent, monitor: a continuous loop rather than a one-way trip. A simple report is enough to start, the resolution path (simple, A3 or 8D) adapts to severity, and a verified lesson can be rolled out to other lines exposed to the same risk.

For: workshops and industrial sites, quality departments handling incidents, non-conformities, near misses and audit findings in a single tool.

What the tool brings

Reporting always simple

Which encourages reporting rather than discouraging it.

Done and effective kept apart

The dashboard does not reward quick closure.

A lesson shared

A verified action benefits the other lines, stations or products exposed to the same risk, without waiting for their own incident.

Interactive demo

Sample data. Change role at the top of the screen to see the reporter, lead or management view.

  1. Switch role at the top of the screen: reporter, owner or management.
  2. Open a resolution case: its path (simple, A3 or 8D) depends on the severity.
  3. Look at the risk register and the prevention rolled out on other lines.
Interactive demo in the browser, sample data. The delivered tool is desktop software. Try the demo full screen →

How it works

A common base of facts, causes, evidence and actions, shared by every resolution path. Reporting always stays simple; qualification steers towards proportionate handling, never forcing an unnecessary A3 or 8D.

Qualification

Type, criticality (severity × frequency) and duplicates suggested from known reports.

Resolution case

Immediate measure, causes (hypothesis or confirmed), actions, with template changes (simple ↔ A3 ↔ 8D) that lose no data already entered.

Backlog

Each action follows a real cycle: to do, in progress, done, then verified effective or reopened if the problem comes back.

Risk register

A control measure can be created straight from a risk, without waiting for an incident.

Prevention

A check created from a lesson rolls out to the other stations or lines exposed to the same risk, and a non-compliant result creates a report automatically.

The starting point

Between the binder of A3s that discourages reporting small problems and the non-conformity spreadsheet that never links an incident to risks or prevention, the company loses the loop: the same causes come back, closed actions were not always verified effective, and a lesson stays confined to the line where it was found.

Adaptations and connections

Everything above already exists. The rest is set up with you, or linked to your other tools.

What we adapt to your organisation

The resolution paths, simple, A3 or 8D, to match your practices and severity thresholds.

Profiles and rights, from the reporter to management.

Your existing records, taken over from your non-conformity spreadsheets and A3 workbooks.

What we can connect

With thetooling : an instrument that fails calibration directly opens a non-conformity, with the measurements concerned.

With theline balancing : a defect is linked to the task and station that produced it, and the corrected procedure is updated for everyone.

With skills management : a corrective action involving training is tracked in the skills matrix.

Deployment

Desktop software, installed on your premises. Your data stays on your server.

Installation

Deployed by your IT department on the relevant computers.

Access

Installed on users' desktop PCs. Five profiles with different rights (reporter, lead, action owner, management, quality manager): a summary Management view, a qualification queue and cases for quality, “My area” for every reporter.

Data

Data is synced through a shared folder on your server.

Want a quality loop that lasts?

We start from your current non-conformities and risks, and from how you already check (or not) the effectiveness of actions.

Discuss a similar situation

Free, no-commitment first conversation, with a reply within 1 to 2 business days.